@@ -470,7 +470,7 @@ Given todo (Tasks):
Tricky incomplete task x 2017-09-18
Execute (Toggle completed):
:global/./call todo#ToggleMarkAsDone('')
execute "%substitute/" . strftime("%Y-%m-%d") . "/**TODAY**/"
execute "silent %substitute/" . strftime("%Y-%m-%d") . "/**TODAY**/"
Expect todo (Toggled tasks with today as **TODAY**):
Complete task
2017-09-01 Completed task with a created date
@@ -488,7 +488,7 @@ Expect todo (Toggled tasks with today as **TODAY**):
Execute (Toggle twice):
:global/./call todo#ToggleMarkAsDone('')
:global/./call todo#ToggleMarkAsDone('')
execute "%substitute/" . strftime("%Y-%m-%d") . "/**TODAY**/"
execute "silent %substitute/" . strftime("%Y-%m-%d") . "/**TODAY**/"
Expect todo (Tasks, completed on today):
x **TODAY** Complete task
x **TODAY** 2017-09-01 Completed task with a created date
@@ -525,50 +525,52 @@ After:
Given todo (Tasks for sorting with a bit of everything):
active dUE:2051-01-01 cAsE EXP:24 GIV:01
overdue due:2001-01-01 EXP:02 GIV:02
notdue overdue:2011-11-11 invalid key EXP:33 GIV:03
notdue overdue:2011-11-11 invalid key EXP:34 GIV:03
overdue duE:2009-01-01 cAsE EXP:18 GIV:04
xoverdue due:2001-02-01 This is not done (must be lower x) EXP:03 GIV:05
overdue due:2012-01-01 \|| no tasks the between bars ||/ EXP:21 GIV:06
x done due:2011-11-11 topmost done task EXP:44 GIV:07
notdue due: 2011-11-11 space invalidates due: EXP:34 GIV:08
x done due:2011-11-11 topmost done task EXP:46 GIV:07
notdue due: 2011-11-11 space invalidates due: EXP:35 GIV:08
overdue due:2005-01-01 +Project @Context EXP:10 GIV:09
overdue due:2002-01-01 @Context EXP:04 GIV:10
overdue due:2004-02-01 EXP:09 GIV:11
notdue due: due:2011-MM-DD EXP:35 GIV:12
notdue due: due:2011-MM-DD EXP:36 GIV:12
overdue due:2000-01-01 cursor here for top, most overdue EXP:01 GIV:13
notdue due:2011-11-1 EXP:36 GIV:14
active due:2059-01-01 bottommost active task EXP:32 GIV:15
notdue due:2011-11-1 EXP:37 GIV:14
active due:2059-01-01 bottommost active task EXP:33 GIV:15
overdue due:2006-01-01 EXP:12 GIV:16
overdue due:2007-02-01 +Project EXP:15 GIV:17
active due:2056-01-01 EXP:29 GIV:18
notdue due:2011-1-11 EXP:37 GIV:19
x done due:2011-11-11 EXP:45 GIV:20
notdue due:2011-1-11 EXP:38 GIV:19
x done due:2011-11-11 EXP:47 GIV:20
overdue dUe:2008-02-01 cAsE EXP:17 GIV:21
X overdue due:2002-02-01 This is not done (must be lower x) EXP:05 GIV:22
+Project overdue due:2003-02-01 project at start of line EXP:07 GIV:23
notdue due:2011 EXP:38 GIV:24
notdue due:2011 EXP:39 GIV:24
active DUe:2052-01-01 cAsE EXP:25 GIV:25
overdue due:2007-01-01 EXP:14 GIV:26
overdue Due:2008-01-01 cAsE EXP:16 GIV:27
notdue @Project EXP:39 GIV:28
notdue @Project EXP:40 GIV:28
active due:2055-01-01 EXP:28 GIV:29
active due:2057-01-01 EXP:30 GIV:30
overdue DuE:2009-02-01 cAsE EXP:19 GIV:31
notdue @Context EXP:40 GIV:32
x done due:2011-11-11 bottommost done task cursor here bottom EXP:46 GIV:33
notdue @Context EXP:41 GIV:32
x done due:2011-11-11 bottommost done task cursor here bottom EXP:48 GIV:33
active DUE:2053-01-01 cAsE EXP:26 GIV:34
active key:value due:2054-01-01 leading key:value EXP:27 GIV:35
active due:2058-01-01 EXP:31 GIV:36
notdue key:value EXP:41 GIV:37
notdue key:value EXP:42 GIV:37
overdue due:2017-01-01 Last overdue task when sorted EXP:22 GIV:38
overdue due:2010-12-31 /|| no tasks the between bars ||\ EXP:20 GIV:39
active due:2050-01-01 cursor here with "notoverdue" setting EXP:23 GIV:40
notdue due:invalid invalid due date EXP:42 GIV:41
notdue due:invalid invalid due date EXP:43 GIV:41
overdue 2011-11-11 due:2005-02-01 leading date EXP:11 GIV:42
due:2004-01-01 overdue due: at start of line EXP:08 GIV:43
notdue notdue:2011-11-11 invalid key EXP:43 GIV:44
notdue notdue:2011-11-11 invalid key EXP:44 GIV:44
overdue due:2006-02-01 due:2011-11-11 two dates, choose first EXP:13 GIV:45
@Context overdue due:2003-01-01 context at start of line EXP:06 GIV:46
active due date at very end of line EXP:32 GIV:47 due:2058-02-01
"FIXME: notdue due:2011-11-11- trailing - invalidates the date EXP:45 GIV:48
Do (Sort by due date):
:call todo#SortDue()\<CR>
Expect todo (Sorted list):
@@ -603,21 +605,22 @@ Expect todo (Sorted list):
active due:2056-01-01 EXP:29 GIV:18
active due:2057-01-01 EXP:30 GIV:30
active due:2058-01-01 EXP:31 GIV:36
active due:2059-01-01 bottommost active task EXP:32 GIV:15
notdue overdue:2011-11-11 invalid key EXP:33 GIV:03
notdue due: 2011-11-11 space invalidates due: EXP:34 GIV:08
notdue due: due:2011-MM-DD EXP:35 GIV:12
notdue due:2011-11-1 EXP:36 GIV:14
notdue due:2011-1-11 EXP:37 GIV:19
notdue due:2011 EXP:38 GIV:24
notdue @Project EXP:39 GIV:28
notdue @Context EXP:40 GIV:32
notdue key:value EXP:41 GIV:37
notdue due:invalid invalid due date EXP:42 GIV:41
notdue notdue:2011-11-11 invalid key EXP:43 GIV:44
x done due:2011-11-11 topmost done task EXP:44 GIV:07
x done due:2011-11-11 EXP:45 GIV:20
x done due:2011-11-11 bottommost done task cursor here bottom EXP:46 GIV:33
active due date at very end of line EXP:32 GIV:47 due:2058-02-01
active due:2059-01-01 bottommost active task EXP:33 GIV:15
notdue overdue:2011-11-11 invalid key EXP:34 GIV:03
notdue due: 2011-11-11 space invalidates due: EXP:35 GIV:08
notdue due: due:2011-MM-DD EXP:36 GIV:12
notdue due:2011-11-1 EXP:37 GIV:14
notdue due:2011-1-11 EXP:38 GIV:19
notdue due:2011 EXP:39 GIV:24
notdue @Project EXP:40 GIV:28
notdue @Context EXP:41 GIV:32
notdue key:value EXP:42 GIV:37
notdue due:invalid invalid due date EXP:43 GIV:41
notdue notdue:2011-11-11 invalid key EXP:44 GIV:44
x done due:2011-11-11 topmost done task EXP:46 GIV:07
x done due:2011-11-11 EXP:47 GIV:20
x done due:2011-11-11 bottommost done task cursor here bottom EXP:48 GIV:33
Do (Sort by due date):
:call todo#SortDue()\<CR>
Then (Check post sort cursor position: top):
@@ -629,7 +632,7 @@ Then (Is cursor at top):
Do (Sort and check cursor position: lastdue):
:let g:TodoTxtSortDueDateCursorPos="lastdue" | call todo#SortDue()\<CR>
Then (Is the cursor on the last task with a due:date?):
AssertEqual 32, line('.')
AssertEqual 33, line('.')
Do (Sort and check cursor position: notoverdue):
:let g:TodoTxtSortDueDateCursorPos="notoverdue" | call todo#SortDue()\<CR>
Then (Is cursor on first non-overdue task?):
@@ -792,18 +795,303 @@ Expect todo (Project SecretProject):
Tricky lowercase @wrongCaseSelected +selectedWrongCase
Project without a context +SecretProject
+SecretProject
Execute (Complete project and switch to preview):
:execute "normal Go+\<C-X>\<C-O>\<ESC>"
:blast!
Expect (Project SecretProject):
Contexts: @Context
Buffers: tests/todo.vader
" FIXME: It seems the omnicomplete preview window tests are being run from the
" .vader file rather than the Given block, weird.
" Execute (Complete project and switch to preview):
" :execute "normal Go+\<C-X>\<C-O>\<ESC>"
" :blast!
" Expect (FIXME Project SecretProject):
" Contexts: @Context
" Buffers: tests/todo.vader
"
" function todo#GetDaysInMonth(month, year) {{{2
Before:
After:
Given:
Execute (todo#GetDaysInMonth):
AssertEqual todo#GetDaysInMonth( 1, 2017), 31, "Days in January not correct"
AssertEqual todo#GetDaysInMonth( 2, 2000), 29, "Days in February 2000 not correct"
AssertEqual todo#GetDaysInMonth( 2, 2100), 28, "Days in February 2100 not correct"
AssertEqual todo#GetDaysInMonth( 2, 2200), 28, "Days in February 2200 not correct"
AssertEqual todo#GetDaysInMonth( 2, 2300), 28, "Days in February 2300 not correct"
AssertEqual todo#GetDaysInMonth( 2, 2400), 29, "Days in February 2400 not correct"
AssertEqual todo#GetDaysInMonth( 2, 2001), 28, "Days in February 2001 not correct"
AssertEqual todo#GetDaysInMonth( 2, 2002), 28, "Days in February 2002 not correct"
AssertEqual todo#GetDaysInMonth( 2, 2003), 28, "Days in February 2003 not correct"
AssertEqual todo#GetDaysInMonth( 2, 2004), 29, "Days in February 2004 not correct"
AssertEqual todo#GetDaysInMonth( 2, 2008), 29, "Days in February 2008 not correct"
AssertEqual todo#GetDaysInMonth( 2, 2010), 28, "Days in February 2010 not correct"
AssertEqual todo#GetDaysInMonth( 2, 2020), 29, "Days in February 2020 not correct"
AssertEqual todo#GetDaysInMonth( 2, 2017), 28, "Days in February 2017 not correct"
AssertEqual todo#GetDaysInMonth( 3, 2017), 31, "Days in March not correct"
AssertEqual todo#GetDaysInMonth( 4, 2017), 30, "Days in April not correct"
AssertEqual todo#GetDaysInMonth( 5, 2017), 31, "Days in May not correct"
AssertEqual todo#GetDaysInMonth( 6, 2017), 30, "Days in June not correct"
AssertEqual todo#GetDaysInMonth( 7, 2017), 31, "Days in July not correct"
AssertEqual todo#GetDaysInMonth( 8, 2017), 31, "Days in August not correct"
AssertEqual todo#GetDaysInMonth( 9, 2017), 30, "Days in September not correct"
AssertEqual todo#GetDaysInMonth(10, 2017), 31, "Days in October not correct"
AssertEqual todo#GetDaysInMonth(11, 2017), 30, "Days in November not correct"
AssertEqual todo#GetDaysInMonth(12, 2017), 31, "Days in December not correct"
" function todo#ParseDate(datestring) {{{2
Before:
After:
Given:
Execute (todo#ParseDate):
AssertEqual todo#ParseDate('2017-01-02'), [2017, 01, 02]
AssertEqual todo#ParseDate('2017-02-01'), [2017, 02, 01]
AssertEqual todo#ParseDate('2017-10-01'), [2017, 10, 01]
AssertEqual todo#ParseDate('2017-11-01'), [2017, 11, 01]
AssertEqual todo#ParseDate('2017-12-01'), [2017, 12, 01]
AssertThrows call todo#ParseDate('17-02-01')
AssertThrows call todo#ParseDate('2017-02-01 ')
AssertThrows call todo#ParseDate(' 2017-02-01')
" function todo#DateAdd(year, month, day, units, unit_type) {{{2
Before:
After:
Given:
Execute (todo#DateAdd, days):
AssertEqual todo#DateAdd(2000, 01, 01, -1, 'd'), [1999, 12, 31]
AssertEqual todo#DateAdd(1999, 12, 31, 1, 'd'), [2000, 01, 01]
AssertEqual todo#DateAdd('2000','01', '01', 1, 'd'), [2000, 01, 02]
AssertEqual todo#DateAdd(2000, 01, 04, -1, 'd'), [2000, 01, 03]
AssertEqual todo#DateAdd(2000, 01, 06, -2, 'd'), [2000, 01, 04]
AssertEqual todo#DateAdd(2000, 01, 03, 2, 'd'), [2000, 01, 05]
AssertEqual todo#DateAdd(1999, 12, 06, 31, 'd'), [2000, 01, 06]
AssertEqual todo#DateAdd(2000, 02, 07, -31, 'd'), [2000, 01, 07]
AssertEqual todo#DateAdd(2001, 01, 08, -366, 'd'), [2000, 01, 08]
AssertEqual todo#DateAdd(1999, 01, 09, 365, 'd'), [2000, 01, 09]
AssertEqual todo#DateAdd(2000, 02, 28, 2, 'd'), [2000, 03, 01]
AssertEqual todo#DateAdd(2000, 02, 28, 1, 'd'), [2000, 02, 29]
AssertEqual todo#DateAdd(2000, 12, 31, 1, 'd'), [2001, 01, 01]
AssertEqual todo#DateAdd(2004, 03, 01, -1, 'd'), [2004, 02, 29]
AssertEqual todo#DateAdd(2010, 03, 31, 1, 'd'), [2010, 04, 01]
AssertEqual todo#DateAdd(2010, 04, 30, 1, 'd'), [2010, 05, 01]
AssertEqual todo#DateAdd(2010, 05, 31, 1, 'd'), [2010, 06, 01]
AssertEqual todo#DateAdd(2010, 06, 30, 1, 'd'), [2010, 07, 01]
AssertEqual todo#DateAdd(2010, 07, 31, 1, 'd'), [2010, 08, 01]
AssertEqual todo#DateAdd(2010, 08, 31, 1, 'd'), [2010, 09, 01]
AssertEqual todo#DateAdd(2010, 09, 30, 1, 'd'), [2010, 10, 01]
AssertEqual todo#DateAdd(2010, 10, 31, 1, 'd'), [2010, 11, 01]
AssertEqual todo#DateAdd(2010, 11, 30, 1, 'd'), [2010, 12, 01]
AssertEqual todo#DateAdd(2010, 12, 31, 1, 'd'), [2011, 01, 01]
AssertEqual todo#DateAdd(2016, 02, 01, -1, 'd'), [2016, 01, 31]
AssertEqual todo#DateAdd(2016, 03, 01, -1, 'd'), [2016, 02, 29]
AssertEqual todo#DateAdd(2016, 04, 01, -1, 'd'), [2016, 03, 31]
AssertEqual todo#DateAdd(2016, 05, 01, -1, 'd'), [2016, 04, 30]
AssertEqual todo#DateAdd(2016, 06, 01, -1, 'd'), [2016, 05, 31]
AssertEqual todo#DateAdd(2016, 07, 01, -1, 'd'), [2016, 06, 30]
AssertEqual todo#DateAdd(2016, 08, 01, -1, 'd'), [2016, 07, 31]
AssertEqual todo#DateAdd(2016, 09, 01, -1, 'd'), [2016, 08, 31]
AssertEqual todo#DateAdd(2016, 10, 01, -1, 'd'), [2016, 09, 30]
AssertEqual todo#DateAdd(2016, 11, 01, -1, 'd'), [2016, 10, 31]
AssertEqual todo#DateAdd(2016, 12, 01, -1, 'd'), [2016, 11, 30]
AssertEqual todo#DateAdd(2017, 01, 01, -1, 'd'), [2016, 12, 31]
AssertEqual todo#DateAdd(2016, 01, 01, -1, 'd'), [2015, 12, 31]
AssertEqual todo#DateAdd(2017, 03, 01, -1, 'd'), [2017, 02, 28]
AssertEqual todo#DateAdd(2017, 02, 28, 1, 'd'), [2017, 03, 01]
AssertEqual todo#DateAdd(2017, 04, 01, 30, 'd'), [2017, 05, 01]
AssertEqual todo#DateAdd(1900, 01, 01, 1520, 'd'), [1904, 03, 01]
AssertEqual todo#DateAdd(2304, 03, 01,-1520, 'd'), [2300, 01, 01]
Execute (todo#DateAdd, months):
" Add one month to a date in the middle of the month should keep day of month
AssertEqual todo#DateAdd(2016, 12, 27, 1, 'm'), [2017, 01, 27]
AssertEqual todo#DateAdd(2017, 01, 27, 1, 'm'), [2017, 02, 27]
AssertEqual todo#DateAdd(2017, 02, 27, 1, 'm'), [2017, 03, 27]
AssertEqual todo#DateAdd(2017, 03, 27, 1, 'm'), [2017, 04, 27]
AssertEqual todo#DateAdd(2017, 04, 27, 1, 'm'), [2017, 05, 27]
AssertEqual todo#DateAdd(2017, 05, 27, 1, 'm'), [2017, 06, 27]
AssertEqual todo#DateAdd(2017, 06, 27, 1, 'm'), [2017, 07, 27]
AssertEqual todo#DateAdd(2017, 07, 27, 1, 'm'), [2017, 08, 27]
AssertEqual todo#DateAdd(2017, 08, 27, 1, 'm'), [2017, 09, 27]
AssertEqual todo#DateAdd(2017, 09, 27, 1, 'm'), [2017, 10, 27]
AssertEqual todo#DateAdd(2017, 10, 27, 1, 'm'), [2017, 11, 27]
AssertEqual todo#DateAdd(2017, 11, 27, 1, 'm'), [2017, 12, 27]
AssertEqual todo#DateAdd(2017, 12, 27, 1, 'm'), [2018, 01, 27]
" Sub one month to a date in the middle of the month should keep day of month
AssertEqual todo#DateAdd(2017, 02, 26, -1, 'm'), [2017, 01, 26]
AssertEqual todo#DateAdd(2017, 03, 26, -1, 'm'), [2017, 02, 26]
AssertEqual todo#DateAdd(2017, 04, 26, -1, 'm'), [2017, 03, 26]
AssertEqual todo#DateAdd(2017, 05, 26, -1, 'm'), [2017, 04, 26]
AssertEqual todo#DateAdd(2017, 06, 26, -1, 'm'), [2017, 05, 26]
AssertEqual todo#DateAdd(2017, 07, 26, -1, 'm'), [2017, 06, 26]
AssertEqual todo#DateAdd(2017, 08, 26, -1, 'm'), [2017, 07, 26]
AssertEqual todo#DateAdd(2017, 09, 26, -1, 'm'), [2017, 08, 26]
AssertEqual todo#DateAdd(2017, 10, 26, -1, 'm'), [2017, 09, 26]
AssertEqual todo#DateAdd(2017, 11, 26, -1, 'm'), [2017, 10, 26]
AssertEqual todo#DateAdd(2017, 12, 26, -1, 'm'), [2017, 11, 26]
AssertEqual todo#DateAdd(2018, 01, 26, -1, 'm'), [2017, 12, 26]
AssertEqual todo#DateAdd(2018, 02, 26, -1, 'm'), [2018, 01, 26]
" End of month should be sticky
AssertEqual todo#DateAdd(2010, 01, 31, 1, 'm'), [2010, 02, 28]
AssertEqual todo#DateAdd(2010, 02, 28, 1, 'm'), [2010, 03, 31]
AssertEqual todo#DateAdd(2010, 03, 31, 1, 'm'), [2010, 04, 30]
AssertEqual todo#DateAdd(2010, 04, 30, 1, 'm'), [2010, 05, 31]
AssertEqual todo#DateAdd(2010, 05, 31, 1, 'm'), [2010, 06, 30]
AssertEqual todo#DateAdd(2010, 06, 30, 1, 'm'), [2010, 07, 31]
AssertEqual todo#DateAdd(2010, 07, 31, 1, 'm'), [2010, 08, 31]
AssertEqual todo#DateAdd(2010, 08, 31, 1, 'm'), [2010, 09, 30]
AssertEqual todo#DateAdd(2010, 09, 30, 1, 'm'), [2010, 10, 31]
AssertEqual todo#DateAdd(2010, 10, 31, 1, 'm'), [2010, 11, 30]
AssertEqual todo#DateAdd(2010, 11, 30, 1, 'm'), [2010, 12, 31]
AssertEqual todo#DateAdd(2010, 12, 31, 1, 'm'), [2011, 01, 31]
" End of month should be sticky
AssertEqual todo#DateAdd(2012, 01, 31, -1, 'm'), [2011, 12, 31]
AssertEqual todo#DateAdd(2012, 02, 29, -1, 'm'), [2012, 01, 31]
AssertEqual todo#DateAdd(2012, 03, 31, -1, 'm'), [2012, 02, 29]
AssertEqual todo#DateAdd(2012, 04, 30, -1, 'm'), [2012, 03, 31]
AssertEqual todo#DateAdd(2012, 05, 31, -1, 'm'), [2012, 04, 30]
AssertEqual todo#DateAdd(2012, 06, 30, -1, 'm'), [2012, 05, 31]
AssertEqual todo#DateAdd(2012, 07, 31, -1, 'm'), [2012, 06, 30]
AssertEqual todo#DateAdd(2012, 08, 31, -1, 'm'), [2012, 07, 31]
AssertEqual todo#DateAdd(2012, 09, 30, -1, 'm'), [2012, 08, 31]
AssertEqual todo#DateAdd(2012, 10, 31, -1, 'm'), [2012, 09, 30]
AssertEqual todo#DateAdd(2012, 11, 30, -1, 'm'), [2012, 10, 31]
AssertEqual todo#DateAdd(2012, 12, 31, -1, 'm'), [2012, 11, 30]
" When adding more than one month, the intermediate months should not impact
" EOM calculations.
AssertEqual todo#DateAdd(2000, 01, 30, 11, 'm'), [2000, 12, 30]
AssertEqual todo#DateAdd(2000, 01, 31, 9, 'm'), [2000, 10, 31]
AssertEqual todo#DateAdd(2001, 12, 30, -11, 'm'), [2001, 01, 30]
AssertEqual todo#DateAdd(2001, 10, 31, -9, 'm'), [2001, 01, 31]
Execute (todo#DateAdd, years):
AssertEqual todo#DateAdd(1900, 11, 30, 1, 'y'), [1901, 11, 30]
AssertEqual todo#DateAdd(1900, 11, 30, 2, 'y'), [1902, 11, 30]
AssertEqual todo#DateAdd(1900, 11, 30, 5, 'y'), [1905, 11, 30]
AssertEqual todo#DateAdd(1915, 11, 30, -1, 'y'), [1914, 11, 30]
AssertEqual todo#DateAdd(1915, 11, 30, -2, 'y'), [1913, 11, 30]
AssertEqual todo#DateAdd(1915, 11, 30, -5, 'y'), [1910, 11, 30]
" 2012 is a leap year
AssertEqual todo#DateAdd(2011, 02, 05, 3, 'y'), [2014, 02, 05]
Execute (todo#DateAdd, boundaries and validity):
AssertEqual todo#DateAdd(1800, 01, 01, 1, 'd'), [1900, 01, 02]
AssertEqual todo#DateAdd(1800, 01, 01, -1, 'd'), [1900, 01, 01]
AssertEqual todo#DateAdd(2017, 30, 01, 1, 'd'), [2017, 12, 02]
AssertEqual todo#DateAdd(2017, 30, 01, -1, 'd'), [2017, 11, 30]
AssertEqual todo#DateAdd(2017, 04, 80, 1, 'd'), [2017, 05, 01]
AssertEqual todo#DateAdd(2017, 04, 80, -1, 'd'), [2017, 04, 30]
AssertEqual todo#DateAdd(2017, 07, 80, -1, 'd'), [2017, 07, 31]
AssertEqual todo#DateAdd(1800, 01, 03, 1, 'm'), [1900, 02, 03]
AssertEqual todo#DateAdd(1800, 01, 03, -1, 'm'), [1900, 01, 03]
AssertEqual todo#DateAdd(2017, 30, 03, 1, 'm'), [2018, 01, 03]
AssertEqual todo#DateAdd(2017, 30, 03, -1, 'm'), [2017, 12, 03]
AssertEqual todo#DateAdd(2017, 04, 80, 1, 'm'), [2017, 05, 31]
AssertEqual todo#DateAdd(2017, 04, 80, -1, 'm'), [2017, 03, 31]
AssertEqual todo#DateAdd(-1, -1, -1, 1, 'd'), [1900, 01, 02]
" People may well use the behaviours below to their advantage, it could be
" useful, we should try to keep this consistent.
AssertEqual todo#DateAdd(0, 0, 0, 1, 'd'), [str2nr(strftime('%Y')), str2nr(strftime('%m')), str2nr(strftime('%d')) + 1]
AssertEqual todo#DateAdd(0, 08, 05, 1, 'd'), [str2nr(strftime('%Y')), 08, 06]
AssertEqual todo#DateAdd(2016, 0, 06, 1, 'd'), [2016, str2nr(strftime('%m')), 07]
AssertEqual todo#DateAdd(2015, 07, 0, 1, 'd'), [2015, 07, str2nr(strftime('%d')) + 1]
AssertEqual todo#DateAdd(2015, 08, 08, 0, 'd'), [2015, 08, 08]
AssertEqual todo#DateAdd(2016, 09, 09, 0, 'm'), [2016, 09, 09]
AssertEqual todo#DateAdd(1600, 50, 50, 0, 'd'), [1900, 12, 31]
AssertEqual todo#DateAdd(0, 50, 50, 0, 'd'), [str2nr(strftime('%Y')), 12, 31]
" function todo#ChangeDueDate(units, unit_type) {{{2
Before:
After:
Given todo (Tasks with a bit of everything):
active dUE:2051-01-01 cAsE L01
notdue overdue:2011-11-11 invalid key L02
xoverdue due:2001-02-01 This is not done (must be lower x) L03
x done due:2011-11-11 completed task L04
notdue due: 2011-11-11 space invalidates due: L05
overdue due:2005-02-28 +Project @Context L06
notdue due: due:2011-MM-DD L07
notdue due:2011-11-1 L08
overdue dUe:2008-02-01 cAsE L09
X overdue due:2002-02-01 This is not done (must be lower x) L10
+Project overdue due:2003-02-01 project at start of line L11
notdue due:2011 L12
active DUe:2052-01-01 cAsE L13
notdue @Project L14
active key:value due:2054-01-01 leading key:value L15
overdue due:2010-12-31 L16
notdue due:invalid invalid due date L17
overdue 2011-11-11 due:2005-02-01 leading date L18
due:2004-01-01 overdue due: at start of line L19
overdue due:2006-02-01 due:2011-11-11 two dates, choose first L20
overdue due:2011-11-11- trailing - invalidates the date L21
active due date at very end of line L22 due:2058-02-01
Execute (todo#ChangeDueDate):
:%call todo#ChangeDueDate(1, 'd')
:let [s:year, s:month, s:day] = todo#ParseDate(strftime("%Y-%m-%d"))
:let [s:year, s:month, s:day] = todo#DateAdd(s:year, s:month, s:day, 1, 'd')
:let s:duedate = printf('%04d', s:year) . '-' . printf('%02d', s:month) . '-' . printf('%02d', s:day)
execute "silent %substitute/" . s:duedate . "/**EXPECTDUE**/"
Expect todo (Tasks with due date incremented):
active dUE:2051-01-02 cAsE L01
notdue overdue:2011-11-11 invalid key L02 due:**EXPECTDUE**
xoverdue due:2001-02-02 This is not done (must be lower x) L03
x done due:2011-11-11 completed task L04
notdue due: 2011-11-11 space invalidates due: L05
overdue due:2005-03-01 +Project @Context L06
notdue due: due:2011-MM-DD L07
notdue due:2011-11-1 L08
overdue dUe:2008-02-02 cAsE L09
X overdue due:2002-02-02 This is not done (must be lower x) L10
+Project overdue due:2003-02-02 project at start of line L11
notdue due:2011 L12
active DUe:2052-01-02 cAsE L13
notdue @Project L14 due:**EXPECTDUE**
active key:value due:2054-01-02 leading key:value L15
overdue due:2011-01-01 L16
notdue due:invalid invalid due date L17
overdue 2011-11-11 due:2005-02-02 leading date L18
due:2004-01-02 overdue due: at start of line L19
overdue due:2006-02-02 due:2011-11-11 two dates, choose first L20
overdue due:2011-11-11- trailing - invalidates the date L21
active due date at very end of line L22 due:2058-02-02
" file: ftplugin/todo.vim {{{1
" Mappings {{{2
Before:
After:
Given todo (Tasks):
First task, postpone 1 day, should result in 2017-01-02 due:2017-01-01
Second task, postpone 5 days, should result in 2017-01-06 due:2017-01-01
Third task, postpone -1 day, should result in 2017-02-19 due:2017-02-20
Forth task, postpone -5 day, should result in 2017-02-15 due:2017-02-20
Fifth task, should not be changed from 2017-03-01 due:2017-03-01
Do (Postpone tasks - normal mode):
\pj5\pj\Pj5\P
Expect todo (Postponed tasks):
First task, postpone 1 day, should result in 2017-01-02 due:2017-01-02
Second task, postpone 5 days, should result in 2017-01-06 due:2017-01-06
Third task, postpone -1 day, should result in 2017-02-19 due:2017-02-19
Forth task, postpone -5 day, should result in 2017-02-15 due:2017-02-15
Fifth task, should not be changed from 2017-03-01 due:2017-03-01
Given todo (Tasks):
Task visual block 1, should result in 2017-01-02 due:2017-01-01 L01
Task visual block 1, should result in 2017-01-02 due:2017-01-01 L02
Task visual block 2, should result in 2017-01-06 due:2017-01-01 L03
Task visual block 2, should result in 2017-01-06 due:2017-01-01 L04
Task visual block 3, should result in 2017-02-19 due:2017-02-20 L05
Task visual block 3, should result in 2017-02-19 due:2017-02-20 L06
Task visual block 4, should result in 2017-02-15 due:2017-02-20 L07
Task visual block 4, should result in 2017-02-15 due:2017-02-20 L08
Fifth task, should not be changed from 2017-03-01 due:2017-03-01 L09
Do (Postpone tasks - visual mode):
Vj\pjVj5\pjVj\PjVj5\P
Expect todo (Postponed tasks):
Task visual block 1, should result in 2017-01-02 due:2017-01-02 L01
Task visual block 1, should result in 2017-01-02 due:2017-01-02 L02
Task visual block 2, should result in 2017-01-06 due:2017-01-06 L03
Task visual block 2, should result in 2017-01-06 due:2017-01-06 L04
Task visual block 3, should result in 2017-02-19 due:2017-02-19 L05
Task visual block 3, should result in 2017-02-19 due:2017-02-19 L06
Task visual block 4, should result in 2017-02-15 due:2017-02-15 L07
Task visual block 4, should result in 2017-02-15 due:2017-02-15 L08
Fifth task, should not be changed from 2017-03-01 due:2017-03-01 L09
Before:
let g:Todo_txt_prefix_creation_date=0
After:
@@ -828,7 +1116,7 @@ Execute (Open some new lines):
:normal oNew task o
:normal ONew task O
:normal A
New task CR
New task CR
execute "silent %substitute/" . strftime("%Y-%m-%d") . "/**TODAY**/"
Expect todo (New task with no creation date):